Feasibility study on implementing modular production system

Mohammad Bakhtiar, B. Johari (2006) Feasibility study on implementing modular production system. [Final Year Project Report] (Unpublished)

[img] PDF
Feasibility study on implementing modular production system (24 pgs).pdf

Download (1MB)
[img] PDF (Please get the password from Digital Collection Development Unit, ext: 3932 / 3914)
Feasibility study on implementing modular production system (fulltext).pdf
Restricted to Registered users only

Download (2MB)
Item Type: Final Year Project Report
Additional Information: Project Report (B.Sc.) - Universiti Malaysia Sarawak , 2006.
Uncontrolled Keywords: Production engineering, modular production system, unimas, university, universiti, Borneo, Malaysia, Sarawak, Kuching, Samarahan, ipta, education, undergraduate, research, Universiti Malaysia Sarawak
Subjects: T Technology > TJ Mechanical engineering and machinery
T Technology > TS Manufactures
Divisions: Academic Faculties, Institutes and Centres > Faculty of Engineering
Faculties, Institutes, Centres > Faculty of Engineering
Depositing User: Karen Kornalius
Date Deposited: 15 Oct 2018 02:44
Last Modified: 15 Oct 2018 02:44
URI: http://ir.unimas.my/id/eprint/22010

Actions (For repository members only: login required)

View Item View Item