Mohammad Bakhtiar, B. Johari (2006) Feasibility study on implementing modular production system. [Final Year Project Report] (Unpublished)
PDF
Feasibility study on implementing modular production system (24 pgs).pdf Download (1MB) |
|
PDF (Please get the password from Digital Collection Development Unit, ext: 3932 / 3914)
Feasibility study on implementing modular production system (fulltext).pdf Restricted to Registered users only Download (2MB) |
Item Type: | Final Year Project Report |
---|---|
Additional Information: | Project Report (B.Sc.) - Universiti Malaysia Sarawak , 2006. |
Uncontrolled Keywords: | Production engineering, modular production system, unimas, university, universiti, Borneo, Malaysia, Sarawak, Kuching, Samarahan, ipta, education, undergraduate, research, Universiti Malaysia Sarawak |
Subjects: | T Technology > TJ Mechanical engineering and machinery T Technology > TS Manufactures |
Divisions: | Academic Faculties, Institutes and Centres > Faculty of Engineering Faculties, Institutes, Centres > Faculty of Engineering |
Depositing User: | Karen Kornalius |
Date Deposited: | 15 Oct 2018 02:44 |
Last Modified: | 15 Oct 2018 02:44 |
URI: | http://ir.unimas.my/id/eprint/22010 |
Actions (For repository members only: login required)
View Item |