Cost estimation methods for internet infrastructure deployment in Rural Sarawak: a review

Abel Yu Hao, Chai and Chean Hung, Lai and Hieng Tiong, Su and Yi Lung, Then and Fei Siang, Tay and Patrick Hui Then, Hang and Natalie Chen Yi, Lim (2020) Cost estimation methods for internet infrastructure deployment in Rural Sarawak: a review. Indonesian Journal of Electrical Engineering and Computer Science, 19 (3). pp. 1375-1383. ISSN 2502-4752

[img] PDF
rural Sarawak1.pdf

Download (28kB)
Official URL: https://ijeecs.iaescore.com/index.php/IJEECS/artic...

Abstract

In rural Sarawak, the internet accessibility is low due to unreliable power grids to support telecommunication network and large geographical area. The risk for network infrastructure implementation is high for internet service provider (ISP), thus more practical and accurate cost estimation methods should be used. This paper reviews different types of cost estimation methods and the accuracy and feasibility of each methods are discussed and compared for network infrastructure implementation in rural Sarawak. The unique characteristics of rural Sarawak are considered in this work, including the topography, development of rural areas and acceptance of new technologies. Different cost estimation methods are identified for different senarios and availability of data.

Item Type: Article
Uncontrolled Keywords: Cost estimation methods Parametric model Probabilistic cost model Rural development Sarawak
Subjects: T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Academic Faculties, Institutes and Centres > Faculty of Engineering
Faculties, Institutes, Centres > Faculty of Engineering
Depositing User: Yi Lung
Date Deposited: 01 Sep 2022 02:20
Last Modified: 01 Sep 2022 02:20
URI: http://ir.unimas.my/id/eprint/39424

Actions (For repository members only: login required)

View Item View Item