Evaluation on PWD 75, standard form of general conditions of contract in Sarawak

Sia, Pik Soon (2008) Evaluation on PWD 75, standard form of general conditions of contract in Sarawak. Masters thesis, Universiti Malaysia Sarawak (UNIMAS).

[img] PDF (Please get the password by email to repository@unimas.my , or call ext: 082-583914/3973/3933)
Sia PS.pdf
Restricted to Registered users only

Download (23MB)

Abstract

The General Conditions of Contract, Public Works Department 75 (PWD75) is the most commonly used standard form of condition of contract in the public sector construction projects in Sarawak. PWD 75 currently in use was last revised in May 1961 and there had not been another revision since then. It is very seldom for a set of conditions of contract used in the construction industry to have not been revised for such a long period. Making comparison with some other more recent standard forms of conditions of contract is an effective way to find out any possible miss-out, incompleteness and even inefficiency or unfairness in PWD 75. By this way, some recommendations for improvement of PWD 75 could be made in order to meet the needs of construction industry in nowadays. It is paramount to promote a fair and just construction contract for the entire public sector construction industry in Sarawak so that the local construction industry will grow in a healthy and balance manner.The General Conditions of Contract, Public Works Department 75 (PWD75) is the most commonly used standard form of condition of contract in the public sector construction projects in Sarawak. PWD 75 currently in use was last revised in May 1961 and there had not been another revision since then. It is very seldom for a set of conditions of contract used in the construction industry to have not been revised for such a long period. Making comparison with some other more recent standard forms of conditions of contract is an effective way to find out any possible miss-out, incompleteness and even inefficiency or unfairness in PWD 75. By this way, some recommendations for improvement of PWD 75 could be made in order to meet the needs of construction industry in nowadays. It is paramount to promote a fair and just construction contract for the entire public sector construction industry in Sarawak so that the local construction industry will grow in a healthy and balance manner.

Item Type: Thesis (Masters)
Additional Information: Thesis (M.Sc.) -- Universiti Malaysia Sarawak, 2008.
Uncontrolled Keywords: Contract, Engineering contracts, PWE75, Public Works Department 75, university, universiti, Borneo, Malaysia, Sarawak, Kuching, Samarahan, IPTA, education, Postgraduate, research, Universiti Malaysia Sarawak.
Subjects: K Law > K Law (General)
Divisions: Academic Faculties, Institutes and Centres > Faculty of Engineering
Faculties, Institutes, Centres > Faculty of Engineering
Depositing User: Karen Kornalius
Date Deposited: 06 Dec 2013 02:48
Last Modified: 09 Aug 2023 06:59
URI: http://ir.unimas.my/id/eprint/385

Actions (For repository members only: login required)

View Item View Item