S. N., Ting and V. C., Darrell and A. B. H., Kueh and Y. Y., Lee and C.K., Ng (2021) Extension of Time (EoT) Considerations in Construction Duration Estimate for Public Construction Projects. IOP Conference Series: Materials Science and Engineering, 1101 (2021). pp. 1-7. ISSN 1757-899X
PDF
eot1.pdf Download (246kB) |
Abstract
Construction duration is defined as the time frame given by the Client of a project use to complete the project under normal working conditions, practice of construction. However, often times, projects faced time overruns and hence, needing to activate contractual remedies like Extension of Time (EoT). This paper aims to investigate the factors related to award the Extension of Time (EoT) for construction projects in especially in the public sector in Sarawak. A structured checklist was created as an instrument and employed to accomplish the objective of this research. A total of 111 previous public projects which were granted EoT were studied. The findings revealed several detailed factors that had typically led to project delays in the State. These findings are expected to offer the construction industry stakeholders in Sarawak a focal point on those delay that could be included in construction project duration estimates and management of construction performances, followed by the appropriate corrective and improvement measures for time management for construction projects.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | UNIMAS, University, Borneo, Malaysia, Sarawak, Kuching, Samarahan, IPTA, education, Universiti Malaysia Sarawak |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Academic Faculties, Institutes and Centres > Faculty of Engineering Faculties, Institutes, Centres > Faculty of Engineering |
Depositing User: | Prof. Dr Ng Chee Khoon |
Date Deposited: | 25 Aug 2021 02:09 |
Last Modified: | 25 Aug 2021 02:09 |
URI: | http://ir.unimas.my/id/eprint/35855 |
Actions (For repository members only: login required)
View Item |