Tsen, S.F (2006) Analisis of the process for traditional general contracting in Sarawak Malaysia. [Final Year Project Report] (Unpublished)
|
PDF
Analisis of the process for traditional general contracting in Sarawak Malaysia.pdf Download (491kB) | Preview |
Abstract
This project investigate on the problems that could occur in every stage of the tender process and to see if there are rooms for improvement. The improvement is necessary so as to optimize the tender process to meet the objective of a construction contract.
Item Type: | Final Year Project Report |
---|---|
Additional Information: | Project Report (B.Sc.) - Universiti Malaysia Sarawak, 2006. |
Uncontrolled Keywords: | tender process, Traditional General Contracting, research, undergraduate, UNIMAS, Universiti Malaysia Sarawak, university, universiti, Borneo, Malaysia, Sarawak, Kuching, Samarahan, IPTA, education |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | Academic Faculties, Institutes and Centres > Faculty of Engineering Faculties, Institutes, Centres > Faculty of Engineering |
Depositing User: | Karen Kornalius |
Date Deposited: | 20 May 2014 08:26 |
Last Modified: | 23 Mar 2015 01:42 |
URI: | http://ir.unimas.my/id/eprint/2778 |
Actions (For repository members only: login required)
View Item |