Hendison, Anak Jeralson Linang (1999) Scheduling production layout using simulation. [Final Year Project Report] (Unpublished)
|
PDF
Scheduling production layout using simulation (24 pgs).pdf Download (1MB) | Preview |
|
PDF (Please get the password from Digital Collection Development Unit, ext: 3932 / 3914.)
Scheduling production layout using simulation (fulltext).pdf Restricted to Registered users only Download (15MB) |
Item Type: | Final Year Project Report |
---|---|
Additional Information: | Project report (B.Sc.) -- Universiti Malaysia Sarawak, 1999. |
Uncontrolled Keywords: | Production management, planning, production layout, unimas, university, universiti, Borneo, Malaysia, Sarawak, Kuching, Samarahan, ipta, education, undergraduate, research, Universiti Malaysia Sarawak |
Subjects: | T Technology > TH Building construction |
Divisions: | Academic Faculties, Institutes and Centres > Faculty of Engineering Faculties, Institutes, Centres > Faculty of Engineering |
Depositing User: | Karen Kornalius |
Date Deposited: | 02 Oct 2018 07:14 |
Last Modified: | 29 Nov 2023 07:12 |
URI: | http://ir.unimas.my/id/eprint/21869 |
Actions (For repository members only: login required)
View Item |