Browse by Additional Information

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Number of items: 52.

Azli Syam, Bin Ibrahim (2004) "24 jam di Jalan Gambier". [Final Year Project Report] (Unpublished)

Helmi, Bin Beladi (2004) Advanced WCMDA multimedia receiver. [Final Year Project Report] (Unpublished)

Nazril bin, Mohd Najib (2004) Application of axiomatic design to the toaster design - a case study. [Final Year Project Report] (Unpublished)

Suriatie, Binti Che Lah (2004) Automatic printing billing system. [Final Year Project Report] (Unpublished)

Liew Yew, Zion (2004) COORDINATION CHEMISTRY OF Ni(II), Cu(II) AND Zn(II) IONS WITH N202 AND N403 DONOR LIGANDS. [Final Year Project Report] (Unpublished)

Lydiana, Binti Johnny Yakop (2004) Creep testing on material. [Final Year Project Report] (Unpublished)

Lim, Nyuk Thin (2004) Deria rasa. [Final Year Project Report] (Unpublished)

Then, Kuck Shee. (2004) Design and fabrication of a solar powered rice cooker or banana dryer. [Final Year Project Report] (Unpublished)

Syamsul Akmal, Bin Ahmad Kamil Saraidin (2004) Design of control system for the poka yoke wagon dolly. [Final Year Project Report] (Unpublished)

Lee, Chee Siong (2004) Determination of heavy metals in mangrove wetland sediments in Asajaya. [Final Year Project Report] (Unpublished)

Nazzatul Asyikin, Mohamad Najib (2004) Distribution and diversity of fishes at artificial reef balls around Talang-Talang islands, Sematan, Sarawak. [Final Year Project Report] (Unpublished)

Supian, Bin Sulkar (2004) Drainage and leakage prevention design for ultra modern landfill dumpsite, Mambong, Sarawak. [Final Year Project Report] (Unpublished)

Siti Noormaya, Binti Bilmas (2004) Dynamic channel allocation for multimedia applications. [Final Year Project Report] (Unpublished)

Bell, Su'ut (2004) Eksplorasi kulit kayu. [Final Year Project Report] (Unpublished)

Anandan, S / O Perumal. (2004) Employee's perception of the successful operation on the major determinants of learning organizations at Centre for Modern Management (CMM). [Final Year Project Report] (Unpublished)

Christopher, Alex (2004) Employees' perception towards the effectiveness of TQM implementation. [Final Year Project Report] (Unpublished)

Othman, Bin Mohamed Yudin (2004) End to end functionlity testing of GSM networks by using PJG 2000. [Final Year Project Report] (Unpublished)

Chai, Sui Thin (2004) Ergonomic Factors Contributing Towards The Effectiveness Of Industrial Safety And Health; An Insight From Komag USA (MALAYSIA) Sarawak Operation. [Final Year Project Report] (Unpublished)

Abdullah Ali, Saini @ Asan (2004) Faktor yang mempengaruhi keberkesanan kumpulan kawalan mutu (KKM) di dalam organisasi. [Final Year Project Report] (Unpublished)

Sylvia, Lim (2004) Faktor-faktor yang mempengaruhi keberkesanan latihan sambil bekerja: Satu kajian kes di cawangan Kim Hin Industry Berhad. [Final Year Project Report] (Unpublished)

Liyana, Binti Abdul Rashid (2004) Front-end Frequency selection for software radio. [Final Year Project Report] (Unpublished)

Sakinah, Dahrawi Edrus (2004) Hydrologic modeling with hec-hms : Sungai Sarawak Kanan Basin. [Final Year Project Report] (Unpublished)

Nor Shahida, Binti Saharadin (2004) Kajian Biologi Dan Tumbuhan Perumah Empat Spesies Kupu-Kupu (Lepidoptera: Rhopalocera. [Final Year Project Report] (Unpublished)

Nelon, Addi (2004) Kulat. [Final Year Project Report] (Unpublished)

Maureen Imang, Jau (2004) Motif tradisional masyarakat Kayan / Kenyah. [Final Year Project Report] (Unpublished)

Helen, Simon Jalin (2004) Persepsi pekerja terhadap tahap organisasi sebagai organisasi pembelajaran di Ibu Pejabat Telekom Malysia Berhad, Miri. [Final Year Project Report] (Unpublished)

Melisa Abby, David Jemut (2004) Philosophical behaviourism : a critical analisis. [Final Year Project Report] (Unpublished)

Stanny, Anak Kane (2004) Rectangular patch with a multi element u-shaped slot microstrip antenna for tv reception. [Final Year Project Report] (Unpublished)

Liew, Michael Kok Yin. (2004) Redesign of go kart transmission system. [Final Year Project Report] (Unpublished)

Hashim, Mohammad (2004) Remote control powerboat II (boat construction and engine installation). [Final Year Project Report] (Unpublished)

Winsell, Anak Juim (2004) Resource optimisation and waste reduction. [Final Year Project Report] (Unpublished)

Liew, Lulu Fa Kiun (2004) Seni tampak sebagai dokumentasi. [Final Year Project Report] (Unpublished)

Jaya, Bin Pala (2004) Setinggan. [Final Year Project Report] (Unpublished)

Anum Suhana, Abu Bakar (2004) Strategi Menangani Tekanan Di Kalangan Pekerja: Satu Tinjauan Di Jabatan Agama Islam Sarawak, Kuching. [Final Year Project Report] (Unpublished)

Chua, Sui Soon (2004) Surveillance and security system with intensity (SSSI). [Final Year Project Report] (Unpublished)

Samson, Ak. Roland Duju (2004) Teachers' competency in using information technology (IT) and training needed for teaching and learning. [Final Year Project Report] (Unpublished)

Mohamad Redza, Bin Ali Madan (2004) Testing of riveted cold-formed steel connections in bearing. [Final Year Project Report] (Unpublished)

Siti Rosalinawati, Binti Ali (2004) Tinjauan terhadap ciri kebolehgunaan laman web jabatan-jabatan kerajaan di Malaysia. [Final Year Project Report] (Unpublished)

Chin, Siok Ling (2004) Trafik. [Final Year Project Report] (Unpublished)

Kemeri, Bin Jalani (2004) Tunggul kayu. [Final Year Project Report] (Unpublished)

Cyrus Nyawai, Mason (2004) Two channels audio links over optical fiber. [Final Year Project Report] (Unpublished)

Tan, Yew Hin (2004) Ultrasonic pulse velocity (UPV) in concrete under compression : a study on effect of aspect ratio. [Final Year Project Report] (Unpublished)

Mohd.Shuckry @ Mohd.Shukry, Bin Jamiri (2004) Warisan Lautan. [Final Year Project Report] (Unpublished)

Suriani, Binti Mohamad Kameri. (2004) The competition of public transport : implementation of new bus using stated preference technique. [Final Year Project Report] (Unpublished)

Zuffazarina, binti Zulkapli and Thanuja, a/p Mahaletchumy and Shazni Izana, Binti Shahruddin and Peter, ak Jerampang and Ming, Koe Hooi and Daphne Dewi, ak Stephen Kalong and Seng, Alex Lee Fook and Aisah Munirah, binti Wahi and Norizan, binti Rosli and Noor Suhaila, binti Abu Bakar and Mursyida, binti Md Nujid and Mariza, binti Md Rasip and Ling, Adeline Kueh Me (2004) A cross sectional study on the prevalence, knowledge, attitude and practice of hypercholesterolaemia among the sampled population of age 35 years and above in kampung Sadong Jaya from 14th June to 20th August 2004. [Final Year Project Report] (Unpublished)

Wong, Leong Sing. (2004) The effectiveness of 3 types of physical traffic calming device : which is most relevant at reducing traffic speeds. [Final Year Project Report] (Unpublished)

Jane ak., Motal (2004) The handoff process for 3rd generation mobile system. [Final Year Project Report]

Ooi, Han Hooi (2004) The study on machining (turning process) for aluminium alloy. [Final Year Project Report] (Unpublished)

Goh, H.W (2004) The study on milling machining for aluminium alloy. [Final Year Project Report] (Unpublished)

Chung, King Long. (2004) A study on the gasoline quality and performance. [Final Year Project Report] (Unpublished)

Dominic Raphael, anak Main (2004) A study on the implementation of just-in-time (jit) manufacturing in Sarawak manufacturing industries. [Final Year Project Report] (Unpublished)

Victor, Anak Jonathan. (2004) A study on the implementation of total quality management (tqm) practice in Sarawak manufacturing industries. [Final Year Project Report] (Unpublished)

This list was generated on Wed Nov 27 13:36:25 2024 +08.