A study on the implementation of just-in-time (jit) manufacturing in Sarawak manufacturing industries

Dominic Raphael, anak Main (2004) A study on the implementation of just-in-time (jit) manufacturing in Sarawak manufacturing industries. [Final Year Project Report] (Unpublished)

[img] PDF
A study on the implementation of just-in-time (JIT) ... (24 pgs).pdf

Download (2MB)
[img] PDF (Please get the password by email to repository@unimas.my, or call ext: 3914/ 3942/ 3933)
Dominic Raphael Main ft.pdf
Restricted to Registered users only

Download (8MB)
Item Type: Final Year Project Report
Additional Information: Project Report (B.Sc.) -- Universiti Malaysia Sarawak, 2004.
Uncontrolled Keywords: Just-in-time systems, Production management, manufacturing industry, unimas, university, universiti, Borneo, Malaysia, Sarawak, Kuching, Samarahan, ipta, education, undergraduate, research, Universiti Malaysia Sarawak
Subjects: T Technology > TS Manufactures
Divisions: Academic Faculties, Institutes and Centres > Faculty of Engineering
Faculties, Institutes, Centres > Faculty of Engineering
Depositing User: Karen Kornalius
Date Deposited: 09 Nov 2018 02:09
Last Modified: 21 Jul 2023 07:03
URI: http://ir.unimas.my/id/eprint/22405

Actions (For repository members only: login required)

View Item View Item